Installing 5kw system to an existing 3kw system - upgrade
When Abby and David reached out to us their electricity bill was high and they were very frustrated with paying so much money each month. They already had a 3KW system that they installed 10 years ago that was not generating enough electricity. After doing a site evaluation, inspecting the old system, evaluating their electricity bill and creating a personalized design we were able to come up with the best suited solution for them. We recommended adding a 5KW system in addition to the existing 3KW solar system. Abby and David were happy with the solution and we were able to schedule the installation for the following week. The installation started by prepping the roof and making sure the shingles are properly attached. We then installed the racking and made sure the racking is leveled and safely attached for the optimizers and panels to go on. We were able to finish the installation in two days and final inspection was scheduled on day three. Abbie was very thankful that we were able to finish the installation within the timeline that was provided initially.
Address: South Hayward Street, Anaheim, CA
Address: South Hayward Street, Anaheim, CA